{"filing":{"accession_number":"0001683168-26-005100","cik":"0001956955","ticker":"UMAC","company_name":"Unusual Machines, Inc.","form":"8-K","filing_date":"2026-06-25","report_date":null,"primary_document":"umac_8k.htm","primary_document_url":"https://www.sec.gov/Archives/edgar/data/1956955/000168316826005100/umac_8k.htm"},"events":[{"id":13756,"run_id":12219,"accession_number":"0001683168-26-005100","anchor_item_number":"1.01","event_type":"ma_activity","event_domain":"operational","is_material":true,"confidence":0.75,"summary":"Unusual Machines announced a planned acquisition of Upgrade Energy, expected to close by mid-Q3 2026. The company simultaneously entered into a lease for a 14,000-square-foot manufacturing facility in Orlando, Florida to expand domestic battery production capacity in connection with the anticipated acquisition.","company_name":"Unusual Machines, Inc.","ticker":"UMAC","filing_date":"2026-06-25","form":"8-K","submitted_at":null,"items":[{"id":10986,"accession_number":"0001683168-26-005100","item_number":"1.01","item_title":"Entry into a","event_type":"ma_activity","event_domain":"operational","is_material":true,"confidence":0.75,"reasoning":"While Item 1.01 formally discloses a lease agreement with FGHP Triplex, LLC, the supplemental press release reveals the lease is material primarily as a supporting action for the planned acquisition of Upgrade Energy, expected to close by mid-Q3 2026. The lease of a 14,000-square-foot Orlando facility is explicitly described as expanding domestic battery production capacity \"in connection with its planned acquisition of Upgrade Energy.\" The acquisition itself is the material event driving the disclosure; the lease is a preparatory step. However, the 8-K Item 1.01 technically covers the lease agreement, not the acquisition announcement, creating some ambiguity about whether to classify this as ma_activity (the acquisition) or operational_other (the lease facility expansion).","classifier_version":"claude-haiku-4-5-20251001+prompt-a85dd512","taxonomy_version":"v1.3","classified_at":"2026-06-25T12:41:43.832037+00:00","company_name":"","ticker":null,"filing_date":""},{"id":10987,"accession_number":"0001683168-26-005100","item_number":"7.01","item_title":"Regulation FD","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.72,"reasoning":"The disclosure announces the signing of a lease for 14,000 square feet of manufacturing space in Orlando, Florida to support the Company's battery business in connection with its planned acquisition of Upgrade Energy. While the filing mentions the anticipated acquisition, the principal disclosed action is the operational decision to lease new manufacturing capacity and expand domestic production footprint. This is a material operational/strategic event (facility expansion supporting growth), but does not fit the specific M\u0026A category since the acquisition itself is only referenced as context and is not the subject of this Item 7.01 disclosure.","classifier_version":"claude-haiku-4-5-20251001+prompt-a85dd512","taxonomy_version":"v1.3","classified_at":"2026-06-25T12:41:43.832037+00:00","company_name":"","ticker":null,"filing_date":""}]}],"classifications":[{"id":10986,"accession_number":"0001683168-26-005100","item_number":"1.01","item_title":"Entry into a","event_type":"ma_activity","event_domain":"operational","is_material":true,"confidence":0.75,"reasoning":"While Item 1.01 formally discloses a lease agreement with FGHP Triplex, LLC, the supplemental press release reveals the lease is material primarily as a supporting action for the planned acquisition of Upgrade Energy, expected to close by mid-Q3 2026. The lease of a 14,000-square-foot Orlando facility is explicitly described as expanding domestic battery production capacity \"in connection with its planned acquisition of Upgrade Energy.\" The acquisition itself is the material event driving the disclosure; the lease is a preparatory step. However, the 8-K Item 1.01 technically covers the lease agreement, not the acquisition announcement, creating some ambiguity about whether to classify this as ma_activity (the acquisition) or operational_other (the lease facility expansion).","classifier_version":"claude-haiku-4-5-20251001+prompt-a85dd512","taxonomy_version":"v1.3","classified_at":"2026-06-25T12:41:43.832037+00:00","company_name":"Unusual Machines, Inc.","ticker":"UMAC","filing_date":"2026-06-25"},{"id":10987,"accession_number":"0001683168-26-005100","item_number":"7.01","item_title":"Regulation FD","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.72,"reasoning":"The disclosure announces the signing of a lease for 14,000 square feet of manufacturing space in Orlando, Florida to support the Company's battery business in connection with its planned acquisition of Upgrade Energy. While the filing mentions the anticipated acquisition, the principal disclosed action is the operational decision to lease new manufacturing capacity and expand domestic production footprint. This is a material operational/strategic event (facility expansion supporting growth), but does not fit the specific M\u0026A category since the acquisition itself is only referenced as context and is not the subject of this Item 7.01 disclosure.","classifier_version":"claude-haiku-4-5-20251001+prompt-a85dd512","taxonomy_version":"v1.3","classified_at":"2026-06-25T12:41:43.832037+00:00","company_name":"Unusual Machines, Inc.","ticker":"UMAC","filing_date":"2026-06-25"}]}
