{"filing":{"accession_number":"0001493152-26-029322","cik":"0001757840","ticker":"INDO","company_name":"Indonesia Energy Corp Ltd","form":"6-K","filing_date":"2026-06-18","report_date":null,"primary_document":"form6-k.htm","primary_document_url":"https://www.sec.gov/Archives/edgar/data/1757840/000149315226029322/form6-k.htm"},"events":[{"id":12075,"run_id":10636,"accession_number":"0001493152-26-029322","anchor_item_number":"EX-99.1","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.85,"summary":"This press release announces successful completion of rig mobilization, safety checks, and setup at the Kruh Block, with confirmation that drilling of the first planned well (K-29) remains on schedule for late June 2026. The disclosure details a material operational milestone in IEC's core exploration and production strategy, including specific timelines for rig-up, function testing, government inspection, and spud date. While not fitting a named operational category, this represents a significant operational development affecting the company's ability to execute its 2026 drilling program and generate future production.","company_name":"Indonesia Energy Corp Ltd","ticker":"INDO","filing_date":"2026-06-18","form":"6-K","submitted_at":null,"items":[{"id":8821,"accession_number":"0001493152-26-029322","item_number":"EX-99.1","item_title":"ex99-1.htm","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.85,"reasoning":"This press release announces successful completion of rig mobilization, safety checks, and setup at the Kruh Block, with confirmation that drilling of the first planned well (K-29) remains on schedule for late June 2026. The disclosure details a material operational milestone in IEC's core exploration and production strategy, including specific timelines for rig-up, function testing, government inspection, and spud date. While not fitting a named operational category, this represents a significant operational development affecting the company's ability to execute its 2026 drilling program and generate future production.","classifier_version":"claude-haiku-4-5-20251001+prompt-08fd3440","taxonomy_version":"v1.2","classified_at":"2026-06-21T19:00:25.732147+00:00","company_name":"","ticker":null,"filing_date":""}]}],"classifications":[{"id":8821,"accession_number":"0001493152-26-029322","item_number":"EX-99.1","item_title":"ex99-1.htm","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.85,"reasoning":"This press release announces successful completion of rig mobilization, safety checks, and setup at the Kruh Block, with confirmation that drilling of the first planned well (K-29) remains on schedule for late June 2026. The disclosure details a material operational milestone in IEC's core exploration and production strategy, including specific timelines for rig-up, function testing, government inspection, and spud date. While not fitting a named operational category, this represents a significant operational development affecting the company's ability to execute its 2026 drilling program and generate future production.","classifier_version":"claude-haiku-4-5-20251001+prompt-08fd3440","taxonomy_version":"v1.2","classified_at":"2026-06-21T19:00:25.732147+00:00","company_name":"Indonesia Energy Corp Ltd","ticker":"INDO","filing_date":"2026-06-18"}]}
