{"filing":{"accession_number":"0001292814-26-004640","cik":"0000917851","ticker":"VALE","company_name":"Vale S.A.","form":"6-K","filing_date":"2026-09-22","report_date":"2026-09-30","primary_document":"vale20260922_6k.htm","primary_document_url":"https://www.sec.gov/Archives/edgar/data/917851/000129281426004640/vale20260922_6k.htm"},"events":[{"id":34215,"run_id":31484,"accession_number":"0001292814-26-004640","anchor_item_number":null,"event_type":"ma_activity","event_domain":"operational","is_material":true,"confidence":0.85,"summary":"Vale entered into an agreement to acquire a 30% minority interest in Ligga S.A. through a capital contribution of approximately US$190 million, coupled with an exclusive long-term offtake agreement for 100% of Ligga's iron ore production. Although Vale's management initially characterized the transaction as not constituting a Material Fact under CVM Resolution No. 44/2021, the CVM/B3 inquiry and Vale's subsequent clarification demonstrate that the transaction involves a material acquisition of a strategic equity stake and production rights in an iron ore operation with significant expansion plans (2 million to 8 million metric tons annually by 2028). The transaction secures long-term access to high-quality ore reserves and integrates Ligga into Vale's Northern System logistics infrastructure, making it a material acquisition activity under Item 1.01 / 2.01 standards.","company_name":"Vale S.A.","ticker":"VALE","filing_date":"2026-09-22","form":"6-K","submitted_at":null,"items":null}],"classifications":[{"id":37894,"accession_number":"0001292814-26-004640","item_number":null,"item_title":null,"event_type":"ma_activity","event_domain":"operational","is_material":true,"confidence":0.85,"reasoning":"Vale entered into an agreement to acquire a 30% minority interest in Ligga S.A. through a capital contribution of approximately US$190 million, coupled with an exclusive long-term offtake agreement for 100% of Ligga's iron ore production. Although Vale's management initially characterized the transaction as not constituting a Material Fact under CVM Resolution No. 44/2021, the CVM/B3 inquiry and Vale's subsequent clarification demonstrate that the transaction involves a material acquisition of a strategic equity stake and production rights in an iron ore operation with significant expansion plans (2 million to 8 million metric tons annually by 2028). The transaction secures long-term access to high-quality ore reserves and integrates Ligga into Vale's Northern System logistics infrastructure, making it a material acquisition activity under Item 1.01 / 2.01 standards.","classifier_version":"claude-haiku-4-5-20251001+prompt-6be895f9","taxonomy_version":"v1.3","classified_at":"2026-09-22T12:58:39.344269+00:00","company_name":"Vale S.A.","ticker":"VALE","filing_date":"2026-09-22"}]}
