{"filing":{"accession_number":"0001171843-26-004645","cik":"0001791703","ticker":"TII","company_name":"Titan Mining Corp","form":"6-K","filing_date":"2026-07-15","report_date":null,"primary_document":"f6k_071526.htm","primary_document_url":"https://www.sec.gov/Archives/edgar/data/1791703/000117184326004645/f6k_071526.htm"},"events":[{"id":17980,"run_id":16133,"accession_number":"0001171843-26-004645","anchor_item_number":"EX-99.1","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.85,"summary":"This press release announces positive metallurgical test results validating the Kilbourne Graphite Project's concentrator flowsheet and downstream processing chain. The disclosure reports achievement of battery-grade purity (≥99.90% Fixed Carbon), concentrator performance exceeding PEA design assumptions (95.9% concentrate grade vs. 95% target; 91.4% recovery vs. 90% target), and industry-leading spherical graphite yields (66% vs. ~50% industry average). These are material operational and technical milestones de-risking the Feasibility Study and supporting the company's plan to build the first fully integrated U.S. graphite supply chain in over 70 years. The event is clearly operational/strategic (project development progress) rather than a discrete financial event, M\u0026A activity, or governance matter, and does not fit the earnings_release category (which reports financial results, not technical project validation).","company_name":"Titan Mining Corp","ticker":"TII","filing_date":"2026-07-15","form":"6-K","submitted_at":null,"items":[{"id":16650,"accession_number":"0001171843-26-004645","item_number":"EX-99.1","item_title":"exh_991.htm","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.85,"reasoning":"This press release announces positive metallurgical test results validating the Kilbourne Graphite Project's concentrator flowsheet and downstream processing chain. The disclosure reports achievement of battery-grade purity (≥99.90% Fixed Carbon), concentrator performance exceeding PEA design assumptions (95.9% concentrate grade vs. 95% target; 91.4% recovery vs. 90% target), and industry-leading spherical graphite yields (66% vs. ~50% industry average). These are material operational and technical milestones de-risking the Feasibility Study and supporting the company's plan to build the first fully integrated U.S. graphite supply chain in over 70 years. The event is clearly operational/strategic (project development progress) rather than a discrete financial event, M\u0026A activity, or governance matter, and does not fit the earnings_release category (which reports financial results, not technical project validation).","classifier_version":"claude-haiku-4-5-20251001+prompt-6be895f9","taxonomy_version":"v1.3","classified_at":"2026-07-15T10:09:08.278500+00:00","company_name":"","ticker":null,"filing_date":""}]}],"classifications":[{"id":16650,"accession_number":"0001171843-26-004645","item_number":"EX-99.1","item_title":"exh_991.htm","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.85,"reasoning":"This press release announces positive metallurgical test results validating the Kilbourne Graphite Project's concentrator flowsheet and downstream processing chain. The disclosure reports achievement of battery-grade purity (≥99.90% Fixed Carbon), concentrator performance exceeding PEA design assumptions (95.9% concentrate grade vs. 95% target; 91.4% recovery vs. 90% target), and industry-leading spherical graphite yields (66% vs. ~50% industry average). These are material operational and technical milestones de-risking the Feasibility Study and supporting the company's plan to build the first fully integrated U.S. graphite supply chain in over 70 years. The event is clearly operational/strategic (project development progress) rather than a discrete financial event, M\u0026A activity, or governance matter, and does not fit the earnings_release category (which reports financial results, not technical project validation).","classifier_version":"claude-haiku-4-5-20251001+prompt-6be895f9","taxonomy_version":"v1.3","classified_at":"2026-07-15T10:09:08.278500+00:00","company_name":"Titan Mining Corp","ticker":"TII","filing_date":"2026-07-15"}]}
