{"filing":{"accession_number":"0001104659-26-109810","cik":"0001879016","ticker":"IE","company_name":"Ivanhoe Electric Inc.","form":"8-K","filing_date":"2026-09-23","report_date":"2026-09-23","primary_document":"tm2625798d1_8k.htm","primary_document_url":"https://www.sec.gov/Archives/edgar/data/1879016/000110465926109810/tm2625798d1_8k.htm"},"events":[{"id":34467,"run_id":31713,"accession_number":"0001104659-26-109810","anchor_item_number":"8.01","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.85,"summary":"Ivanhoe Electric released an updated Preliminary Feasibility Study (PFS) for its Santa Cruz Copper Project in Arizona on September 23, 2026, prepared by qualified third-party engineering firms in accordance with SEC S-K 1300 mining disclosure regulations. The 2026 PFS replaces the prior technical report dated June 23, 2025 and includes updated mineral resource and reserve estimates, mining methods, processing flowsheets, and capital and operating cost estimates, representing a material advancement in the company's project development and strategic direction.","company_name":"Ivanhoe Electric Inc.","ticker":"IE","filing_date":"2026-09-23","form":"8-K","submitted_at":null,"items":[{"id":38194,"accession_number":"0001104659-26-109810","item_number":"7.01","item_title":"Regulation FD Disclosure.","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.85,"reasoning":"Ivanhoe Electric released a Preliminary Feasibility Study (PFS) for its Santa Cruz Copper Project in Arizona on September 23, 2026. This is a material operational and strategic milestone disclosing detailed technical, economic, and environmental assessments of a major mining development project. While not fitting the specific categories of M\u0026A, earnings release, or other named event types, the PFS represents a significant advancement in the company's project development and would materially affect investor assessment of the registrant's operational prospects and capital requirements.","classifier_version":"claude-haiku-4-5-20251001+prompt-a85dd512","taxonomy_version":"v1.3","classified_at":"2026-09-23T11:14:47.970243+00:00","company_name":"","ticker":null,"filing_date":""},{"id":38195,"accession_number":"0001104659-26-109810","item_number":"8.01","item_title":"Other Events.","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.85,"reasoning":"Ivanhoe Electric disclosed an updated Preliminary Feasibility Study (PFS) for its Santa Cruz Copper Project dated September 23, 2026, prepared by multiple qualified third-party engineering firms in accordance with SEC S-K 1300 mining disclosure regulations. The 2026 PFS replaces and supersedes the prior technical report dated June 23, 2025. This represents a material update to the company's development plans for a major copper mining project, including updated mineral resource and reserve estimates, mining methods, processing flowsheets, capital and operating cost estimates, and economic analysis. Such technical updates are material to investors assessing the project's viability and the company's strategic direction, though the event does not fit neatly into the specific operational categories (e.g., it is not a contract, partnership, or regulatory milestone per se, but rather a comprehensive technical reassessment).","classifier_version":"claude-haiku-4-5-20251001+prompt-a85dd512","taxonomy_version":"v1.3","classified_at":"2026-09-23T11:14:47.970243+00:00","company_name":"","ticker":null,"filing_date":""}]}],"classifications":[{"id":38194,"accession_number":"0001104659-26-109810","item_number":"7.01","item_title":"Regulation FD Disclosure.","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.85,"reasoning":"Ivanhoe Electric released a Preliminary Feasibility Study (PFS) for its Santa Cruz Copper Project in Arizona on September 23, 2026. This is a material operational and strategic milestone disclosing detailed technical, economic, and environmental assessments of a major mining development project. While not fitting the specific categories of M\u0026A, earnings release, or other named event types, the PFS represents a significant advancement in the company's project development and would materially affect investor assessment of the registrant's operational prospects and capital requirements.","classifier_version":"claude-haiku-4-5-20251001+prompt-a85dd512","taxonomy_version":"v1.3","classified_at":"2026-09-23T11:14:47.970243+00:00","company_name":"Ivanhoe Electric Inc.","ticker":"IE","filing_date":"2026-09-23"},{"id":38195,"accession_number":"0001104659-26-109810","item_number":"8.01","item_title":"Other Events.","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.85,"reasoning":"Ivanhoe Electric disclosed an updated Preliminary Feasibility Study (PFS) for its Santa Cruz Copper Project dated September 23, 2026, prepared by multiple qualified third-party engineering firms in accordance with SEC S-K 1300 mining disclosure regulations. The 2026 PFS replaces and supersedes the prior technical report dated June 23, 2025. This represents a material update to the company's development plans for a major copper mining project, including updated mineral resource and reserve estimates, mining methods, processing flowsheets, capital and operating cost estimates, and economic analysis. Such technical updates are material to investors assessing the project's viability and the company's strategic direction, though the event does not fit neatly into the specific operational categories (e.g., it is not a contract, partnership, or regulatory milestone per se, but rather a comprehensive technical reassessment).","classifier_version":"claude-haiku-4-5-20251001+prompt-a85dd512","taxonomy_version":"v1.3","classified_at":"2026-09-23T11:14:47.970243+00:00","company_name":"Ivanhoe Electric Inc.","ticker":"IE","filing_date":"2026-09-23"}]}
