{"filing":{"accession_number":"0001104659-26-078750","cik":"0001340677","ticker":"SVM","company_name":"SILVERCORP METALS INC","form":"6-K","filing_date":"2026-06-29","report_date":null,"primary_document":"tm2619048d2_6k.htm","primary_document_url":"https://www.sec.gov/Archives/edgar/data/1340677/000110465926078750/tm2619048d2_6k.htm"},"events":[{"id":14569,"run_id":12978,"accession_number":"0001104659-26-078750","anchor_item_number":"EX-99.1","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.75,"summary":"This is a comprehensive technical report on the Curipamba-El Domo polymetallic project in Ecuador, prepared by SRK Consulting for Silvercorp Metals Inc. The report contains mineral resource and reserve estimates, mining and processing plans, environmental assessments, and economic analysis. While technical reports are standard industry practice for mining projects, this document discloses material operational and strategic information about the project's development status, resource base, and economic viability that would be relevant to investors assessing the company's asset base and future production potential.","company_name":"SILVERCORP METALS INC","ticker":"SVM","filing_date":"2026-06-29","form":"6-K","submitted_at":null,"items":[{"id":12043,"accession_number":"0001104659-26-078750","item_number":"EX-99.1","item_title":"tm2619048d2_ex99-1.htm","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.75,"reasoning":"This is a comprehensive technical report on the Curipamba-El Domo polymetallic project in Ecuador, prepared by SRK Consulting for Silvercorp Metals Inc. The report contains mineral resource and reserve estimates, mining and processing plans, environmental assessments, and economic analysis. While technical reports are standard industry practice for mining projects, this document discloses material operational and strategic information about the project's development status, resource base, and economic viability that would be relevant to investors assessing the company's asset base and future production potential.","classifier_version":"claude-haiku-4-5-20251001+prompt-6be895f9","taxonomy_version":"v1.3","classified_at":"2026-06-29T18:17:41.000094+00:00","company_name":"","ticker":null,"filing_date":""}]}],"classifications":[{"id":12043,"accession_number":"0001104659-26-078750","item_number":"EX-99.1","item_title":"tm2619048d2_ex99-1.htm","event_type":"operational_other","event_domain":"operational","is_material":true,"confidence":0.75,"reasoning":"This is a comprehensive technical report on the Curipamba-El Domo polymetallic project in Ecuador, prepared by SRK Consulting for Silvercorp Metals Inc. The report contains mineral resource and reserve estimates, mining and processing plans, environmental assessments, and economic analysis. While technical reports are standard industry practice for mining projects, this document discloses material operational and strategic information about the project's development status, resource base, and economic viability that would be relevant to investors assessing the company's asset base and future production potential.","classifier_version":"claude-haiku-4-5-20251001+prompt-6be895f9","taxonomy_version":"v1.3","classified_at":"2026-06-29T18:17:41.000094+00:00","company_name":"SILVERCORP METALS INC","ticker":"SVM","filing_date":"2026-06-29"}]}
